1119 Oliver Avenue

A phased Pacific Beach multifamily project: a full renovation of an existing five-unit building, with four proposed new ADUs behind it, bringing the property to nine residences.
Phased Multifamily Renovation + New ADUs · Inabnet as Construction Manager
 

Multifamily Renovation + New ADUs5 Units → 9 ResidencesPacific Beach, San DiegoPhase 1 Underway

Conceptual rendering — subject to final design and approvals.

5

EXISTING UNITS

4

PROPOSED ADUS

9

RESIDENCES AT COMPLETION

2

PHASES

2027

PHASE 2 START (ANTICIPATED)

CM

INABNET'S ROLE

Five renovated homes now, four new ADUs next

1119 Oliver Avenue is a phased multifamily project in Pacific Beach, San Diego. It combines the renovation of an existing five-unit, two-story building with four proposed new accessory dwelling units (ADUs) behind it, bringing the property to nine residences upon completion.

Phase 1, now underway, renovates all five existing units. Phase 2 adds two proposed three-story duplex buildings at the rear of the lot, with rooftop decks and the site and utility work to support them. Phase 2 plans remain in design and City review.

Inabnet Contracting serves as the owner’s third-party construction manager, providing plan, budget and schedule oversight on Phase 1 and assisting with preconstruction coordination for Phase 2. It is the kind of owner-side oversight Inabnet brings to Pacific Beach multifamily projects.

Project at a glance

  • Project type: Phased multifamily renovation plus new ADU construction
  • Inabnet’s role: Owner’s third-party Construction Manager
  • Location: 1119 Oliver Avenue, Pacific Beach, San Diego, CA
  • Existing building: Five units, two stories
  • Proposed addition: Four ADUs in two three-story duplex buildings
  • At completion: Nine residences
  • Status: Phase 1 renovation underway; Phase 2 in design and City review
  • Phase 2 groundbreaking: Anticipated Q1–Q2 2027, subject to approvals and final scheduling

Project highlights

  • Full renovation of all five existing units
  • Updated kitchens and bathrooms, cabinetry and countertops
  • New flooring and stairs, lighting and plumbing fixtures
  • New HVAC, replacement windows and exterior doors
  • Coastal modern interiors with white oak finishes
  • Two proposed three-story duplex buildings with rooftop decks
  • Associated site and utility improvements
  • Property grows from five to nine residences

1119 Oliver Avenue, Pacific Beach

  • Project typeRenovation + new ADUs
  • Existing units5 (two stories)
  • Proposed ADUs4
  • New buildings2 three-story duplexes
  • Rooftop decksYes, on new buildings
  • Residences at completion9
  • NeighborhoodPacific Beach, San Diego
  • Inabnet’s roleConstruction Manager
  • Phase 1Renovation underway
  • Phase 2Design & City review
  • Phase 2 startQ1–Q2 2027 (anticipated)

Coastal modern inside, a contemporary addition out back

The Phase 1 interiors follow a coastal modern design: white oak cabinetry and finishes, light stone countertops, and coordinated tile and stone selections carried through the kitchens and bathrooms. The renovation also replaces the building’s windows and exterior doors and brings in new HVAC, lighting and plumbing fixtures.

The conceptual renderings for Phase 2 show two three-story duplex buildings behind the existing building: light stucco massing with warm wood-look accents, a stone-clad base, glass balcony guards, and rooftop decks with glass railings. Final elevations and finishes are subject to design and City approvals.

Adding ADUs behind an existing multifamily building is one of the most direct ways to add homes on a Pacific Beach lot without demolishing the units already there.

Phase 1: Renovation underway

All five existing units are being renovated, with a coastal modern design built around white oak finishes and coordinated tile and stone selections.

  • Updated kitchens and bathrooms
  • Cabinetry and countertops
  • Flooring and stairs
  • Lighting and plumbing fixtures
  • HVAC
  • Replacement windows and exterior doors

Phase 2: New construction

Two proposed three-story duplex buildings will add four ADUs behind the existing building. Plans remain in design and City review, with groundbreaking anticipated in Q1–Q2 2027, subject to approvals and final scheduling.

  • Two three-story duplex buildings
  • Four new ADUs
  • Rooftop decks
  • Associated site improvements
  • Associated utility improvements
  • In design and City review

Owner-side construction management on both phases

Inabnet works for the owner, not the trades. Daily field management and installation remain with the project’s general contractor; Inabnet reviews, coordinates and oversees on the owner’s behalf.

Phase 1 Construction Management
  • Plan & constructability reviewOngoing
  • Budget & scope reviewOngoing
  • Schedule & procurement coordinationOngoing
  • Construction progress oversightOngoing
  • Field management & installationGeneral contractor
Phase 2 Preconstruction
  • Design & City reviewIn progress
  • Preconstruction coordinationInabnet assisting
  • Scope4 ADUs, 2 duplex buildings
  • Site & utility improvementsIn planning
  • GroundbreakingQ1–Q2 2027 (anticipated)

Conceptual renderings

The renderings below illustrate the proposed Phase 2 exteriors and the Phase 1 interiors. All are conceptual and subject to final design and approvals. This page will be updated with construction photography as work progresses.

Conceptual rendering of two proposed three-story ADU duplex buildings with rooftop decks behind 1119 Oliver Avenue in Pacific Beach, San Diego

Phase 2: proposed three-story ADU duplexes
Conceptual rendering — subject to final design and approvals.

Conceptual rendering of a renovated coastal modern kitchen with white oak cabinetry and a waterfall island at 1119 Oliver Avenue in Pacific Beach

Phase 1: renovated kitchen, white oak finishes
Conceptual rendering — subject to final design and approvals.

Conceptual rendering of a renovated bathroom with sage herringbone tile, a floating white oak vanity and terrazzo-look floor at 1119 Oliver Avenue

Phase 1: renovated bathroom, tile and stone
Conceptual rendering — subject to final design and approvals.

Phase 1 underway. Phase 2 groundbreaking anticipated in 2027.

Phase 1 renovation of all five existing units is underway, with Inabnet overseeing plans, budget, scope, schedule, procurement and construction progress for the owner.

Phase 2 is in design and City review. Inabnet is assisting with preconstruction coordination so the new ADUs can move to construction with a reviewed budget and a realistic schedule once approvals are in hand. That early coordination is the core of how Inabnet approaches entitlement and construction on multifamily work.

Inabnet Contracting’s current projects page will be updated as 1119 Oliver Avenue moves through both phases.

Project timeline

  • Now: Phase 1 renovation of all five existing units
  • Now: Construction management and progress oversight for the owner
  • Now: Phase 2 design and City review
  • Now: Phase 2 preconstruction coordination
  • Q1–Q2 2027 (anticipated): Phase 2 groundbreaking, subject to approvals and final scheduling
  • At completion: Nine residences on the property

Renovating a multifamily property or adding ADUs in San Diego?

Inabnet provides construction management, preconstruction and general contracting for multifamily owners across San Diego, from unit renovations to new ADUs. If you want your plans, budget and schedule reviewed by someone working on your side of the table, start a conversation.